If you’ve ever worked in construction, shoring, or excavation support, you’ve probably heard the term “waler plate” tossed around—and if you’re a project engineer, foreman, or even a small business owner trying to keep a site safe, you know their spacing isn’t something you can guess at. When I first started in the waler plate supply business 12 years ago, I’d get calls all the time from guys on-site who’d say, “My engineer said I need walers 4 feet apart, but can I push that to 5 to save money?” At the time, I’d just warn them about code failures and structural stress, but over the years I’ve learned that most people asking that question aren’t being reckless—they just don’t have a clear, step-by-step way to calculate the right spacing, especially when they’re sourcing materials from someone like me who’s actually on their team, not just pushing inventory. Waler Plate

Today, I’m pulling back the curtain on how we at [our company] walk customers through this. I’m not a structural engineer, but I’ve partnered with some of the best in the industry to make this process practical, code-compliant, and tailored to the materials we supply—because the wrong spacing doesn’t just risk a project getting shut down; it risks lives. Let’s break this down like we would over a coffee at a job site trailer, no fancy jargon (okay, a little jargon, but I’ll explain it).
First, let’s define what we’re talking about, because “waler plate” can mean different things depending on where you’re working. For us, a waler is a horizontal structural beam (usually steel, timber, or aluminum—all we stock) that runs perpendicular to the vertical sheeting (think steel sheet piles, wood lagging, or precast concrete panels) in shoring systems, excavations, or even formwork for concrete walls. Their whole job is to distribute the lateral force from soil, water, or construction loads evenly to the vertical sheeting and the horizontal braces (or tiebacks) that hold the whole system in place. Get their spacing wrong, and you’ll end up with a bowed sheet pile, a shifted excavation, or worse.
The first, non-negotiable step before you do any math is to get the site-specific load data from a registered professional engineer (PE). This isn’t something you can Google and fill in for every job. Soil type changes every 10 feet down; groundwater pressure spikes after rain; and construction loads (like a nearby crane, dump truck, or even a stack of lumber) add unexpected lateral force. I can’t tell you how many times a customer has called me saying, “This is a standard excavation—just tell me the number” and I’ve had to pass them back to their engineer because we don’t have their specific soil report. Most building codes (OSHA in the US, Eurocode 7 in the EU, AS 2870 in Australia) require this, and cutting that corner is how you end up on the evening news or with a $100,000 rework bill. That said, once you have that data, you can use a consistent process to calculate spacing that works for whatever waler size or material you’re using.
Let’s walk through that process step by step, using an example that’s common for our customers: a 12-foot deep excavation in medium-dense sand, with no surcharge load (meaning no extra loads on top of the excavation edge), groundwater 8 feet down, and steel sheet pile sheeting. We’re using 8-inch deep structural steel waler plates—one of our top sellers, since steel is durable and holds up well to corrosion when we coat it with our standard hot-dip galvanizing.
Step 1: Identify the governing lateral load per unit length. The load here is the amount of force pushing sideways on every inch of your sheeting, usually measured in pounds per linear foot (plf) or kilonewtons per linear meter (kN/m). For our sand example, let’s say the engineer has calculated the maximum lateral pressure at the bottom of the excavation is 3,200 pounds per square foot (psf) or ~153 kPa. But wait—pressure isn’t uniform along the excavation. It’s zero at the top, increases to that maximum at the bottom, so we don’t just multiply by the full depth. Instead, we take the equivalent uniform lateral load (EUL), which is a simplified value engineers use for shoring design to avoid complex curve calculations. For our example, that EUL ends up being 1,800 plf (or ~26 kN/m, if you’re working metric). That’s the total force pushing on one linear foot of sheeting.
Step 2: Determine the allowable bending stress of your waler material. Walers act like horizontal beams that are supported at the braces or tiebacks at their ends, and spaced vertically along the sheeting. When they have to resist that lateral load, they bend, and their maximum stress can’t exceed what the material is rated for, otherwise it will buckle or crack. For structural steel waler plates like our 8-inch model, the allowable bending stress (let’s call this Fb) per AISC (American Institute of Steel Construction) standards is 36,000 psi (or 250 MPa for metric steel). For timber walers, it’s lower—usually around 1,500 psi for Douglas fir, the most common timber waler we supply for residential and small commercial excavations. For aluminum, it’s around 21,000 psi. This is a non-negotiable number, and it’s stamped on every waler we sell, so you don’t have to guess.
Step 3: Calculate the section modulus of your waler. The section modulus (S) is a property of the waler’s shape and size that tells you how well it resists bending. It’s specific to each waler plate we manufacture. For our 8-inch steel waler, the section modulus is 21.8 cubic inches (in³). If you’re using a timber waler, it’s (width * depth²)/6—so a 6×8 timber waler would have a section modulus of (6 * 8²)/6 = 64 in³. For aluminum, it’s similar, but the section modulus is tailored to the alloy we use. Every product page on our site lists this number, or if you call us, we’ll send you the spec sheet within an hour—no waiting around.
Step 4: Use the bending stress formula to solve for vertical spacing. The basic formula engineers use for this is: S = (w * L²) / (8 * Fb), where:
- S = section modulus (in³ or m³, depending on units)
- w = lateral load per unit length (plf or kN/m)
- L = span of the waler, which is the vertical spacing between walers (wait, that’s exactly what we’re solving for!)
- Fb = allowable bending stress (psi or MPa)
Let’s plug our example numbers in to make this concrete. We have S = 21.8 in³, w = 1,800 plf, Fb = 36,000 psi. First, we need to convert units so they match: plf is pounds per foot, so we’ll convert that to pounds per inch (divide by 12) to align with inches in S. So w = 1,800 / 12 = 150 plf per inch. Now rearrange the formula to solve for L:
L² = (S * 8 * Fb) / w
L² = (21.8 * 8 * 36,000) / 150
L² = (21.8 * 288,000) / 150
L² = 6,278,400 / 150
L² = 41,856
L = √41,856 ≈ 204.6 inches? Wait, no—wait, I messed up the unit conversion earlier. Let’s do that right. When working with imperial units, it’s easier to keep w in plf, S in in³, Fb in psi, and convert L to feet. The adjusted formula for imperial units is L (in feet) = √( (S * 8 * Fb) / (w * 144) ). That’s because 1 square foot is 144 square inches, so we account for that. Let’s redo that:
L = √( (21.8 * 8 * 36,000) / (1,800 * 144) )
L = √( (6,278,400) / (259,200) )
L = √24.22 ≈ 4.92 feet.
Oh, that makes sense—almost 5 feet. That’s where the earlier call from the customer came in: they wanted to go to 5 feet, and that works here. But wait, we’re not done, because bending stress isn’t the only failure mode for walers. We also have to check for shear stress and bearing stress, especially for steel walers.
Step 5: Check shear stress to confirm spacing is safe. Shear stress is the force that acts perpendicular to the waler, like cutting a piece of paper, and it’s another limit we have to account for. The formula for maximum shear in a simply supported beam (which is what our waler is, supported at the braces) is V = (w * L) / 2, and the allowable shear stress (Fv) for our 8-inch steel waler is 21,600 psi, per AISC. The shear capacity of the waler is (0.6 * Fv * d * t), where d is the depth of the waler and t is its thickness. For our 8-inch waler, d = 8 inches, t = 0.375 inches, so shear capacity is 0.6 * 21,600 * 8 * 0.375 = 38,880 pounds. Now plug in our L of 4.92 feet and w of 1,800 plf: V = (1,800 * 4.92) / 2 = ~4,428 pounds. That’s way below the shear capacity, so spacing at 5 feet is safe here.
If we were using a timber waler, the shear limit would be much lower, so spacing would have to be tighter. For example, a 6×8 Douglas fir waler has an allowable shear stress of 95 psi, so its shear capacity would be around 2,280 pounds, which would cap spacing at around 3.5 feet in this same example. That’s why we always help customers match waler material to their spacing needs—no point buying a heavy steel waler if a timber one works for tighter spacing, and no point using thin timber if you need wider spacing.
Now, what about edge cases? We run into these all the time, and they’re the ones that trip people up. First, surcharge load: if there’s a road, building, or pile of dirt within 2 feet of the excavation, that adds extra lateral force, so you have to include that in your EUL. A 200 psf surcharge adds ~500 plf to our example load, which would drop the safe spacing from 4.92 feet to around 3.8 feet. That’s a big difference, and it’s why we always ask customers about any loads near the excavation before we recommend walers.
Another edge case: sloped vs. vertical sheeting. If your sheeting is sloped, the lateral load isn’t horizontal, so you have to factor in the angle of the slope to get the correct force component. We had a customer last year working on a hillside excavation that was sloped at 30 degrees, and they almost used the same spacing as a flat excavation until we caught that the slope added a 15% extra load. That would have meant their walers were spaced too far, and they would have had a failure within a week.
One more thing: waler overlap and bracing placement. If you’re using two walers stacked vertically (which is common for deep excavations over 15 feet), you have to calculate spacing for the top and bottom walers separately, because the load at the top is lower and the load at the bottom is higher. Also, the span L we calculated assumes the walers are braced at regular intervals, usually 8 to 12 feet apart. If your braces are further apart than that, you have to use the brace span as part of the waler’s span, not the vertical spacing. That’s a common mistake I see: people mix up vertical waler spacing with horizontal brace spacing, and end up with way overstressed walers.
Now, I know a lot of you are thinking, “This is fine for small projects, but what about large, complex jobs?” For those, we work directly with the engineer to provide pre-approved waler sizing and spacing that’s aligned with ASTM standards, so there’s no need to do extra calculations on-site. We also have a free spacing calculator on our portal for smaller projects, that uses the steps I outlined here, as long as you input the correct site load data. It’s not a replacement for a PE’s sign-off, but it’s a great tool to double-check their numbers or get a rough estimate before you finalize your material list.
Over the years, I’ve seen too many projects cut corners on waler spacing to save a few bucks, and the fallout is never worth it. A few years back, a customer of mine tried to push spacing from 5 feet to 6 feet on a 10-foot deep excavation in clay, and the walers bowed so much that sheeting shifted 2 inches, requiring a full shoring replacement that cost 10x the money they “saved” on extra walers. That’s why we at [our company] don’t just sell waler plates—we sell peace of mind. We’ll walk you through every step of the calculation, confirm your load data, recommend the right material and spacing for your site, and even provide stamped spec sheets that your engineer can sign off on.

At the end of the day, calculating waler plate spacing isn’t rocket science, but it’s also not something you should guess at. It requires understanding of structural loads, material properties, and local building codes, and it’s always better to double-check than to move forward with untested numbers. If you’re working on a project and need help figuring out the right spacing, or if you’re ready to order waler plates that meet your exact specs, don’t hesitate to reach out to our team to discuss your requirements in detail.
Tripod & Forkhead References:
- American Institute of Steel Construction (AISC). (2022). Steel Construction Manual, 15th Edition.
- Occupational Safety and Health Administration (OSHA). (2023). Excavation Protection, 29 CFR Part 1926 Subpart P.
- American Society of Civil Engineers (ASCE). (2019). Minimum Design Loads and Associated Criteria for Buildings and Other Structures (ASCE 7-19).
- International Code Council (ICC). (2021). International Building Code (IBC).
Rizhao Wellfit Scafform Co., Ltd.
As one of the most professional waler plate manufacturers and suppliers in China, we have world-leading production equipment and strong manufacturing capabilities. Please feel free to buy high quality waler plate at competitive price from our factory.
Address: No.7, Huasheng Road, Taoluo Town Industrial Zoon, Donggang District, Rizhao City
E-mail: sales@wfscafform.com
WebSite: https://www.wfscafform.com/